KTM Komuter riders, especially those using the Tanjung Malim – Pelabuhan Klang line, take note. KTM has announced that train services are facing delays of between 40 to 60 minutes from the original scheduled times.
This is because of disruption to signalling at Batang Kali, as well as track repair works between that town and Serendah. The rail operator says that it will release periodic updates, and apologises for the inconvenience caused. If you have alternative transport, use it.
Anyway, today (August 23) was supposed to be the start of a temporary schedule for the Tanjung Malim – Pelabuhan Klang – Tanjung Malim line for work days. The weekend temporary schedule starts tomorrow, August 24. This is because of the track repair work between Batang Kali and Serendah. Check the temporary schedule in the KTMB Mobile app or www.ktmb.com.my.
Looking to sell your car? Sell it with Carro.
Content Disclaimer and Copyright Notice
Content Disclaimer
The content provided on this website is sourced from various RSS feeds and other publicly available sources. We strive to ensure the accuracy and reliability of the information, and we always provide source links to the original content. However, we are not responsible for the content’s accuracy or any changes made to the original sources after the information is aggregated on our site.
Fair Use and Copyright Notice
This website may contain copyrighted material, the use of which has not always been specifically authorized by the copyright owner. We believe this constitutes a “fair use” of any such copyrighted material as provided for in section 107 of the US Copyright Law.
In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. If you wish to use copyrighted material from this site for purposes of your own that go beyond fair use, you must obtain permission from the copyright owner.